Flyover bridge for special transports in Nieborowice

In order to secure the existing bridge over the Bierawka River in the town of Nieborowice during the transport of oversized loads destined for the power plant in Rybnik, a temporary JSK450 bridge of 21m length was used in the role of a 'Flyover' bridge, i.e., a bridge over the existing bridge. Installed and dismantled several times in the same location during consecutive nighttime passages, it allowed for the safe passage of loads weighing several hundred tons.

Condividi:

Dettagli del progetto

Soluzione
Ponte a trave
Tipo
JSK-JBB
Lunghezza
21m + ramps
Larghezza
6,3m
Capacità
Super heavy transports