Flyover bridge in Poznań

Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).

Condividi:

Dettagli del progetto

Soluzione
Ponte a trave
Tipo
JSK-JBB
Lunghezza
13,5m
Larghezza
3,6m
Carico di traffico ammissibile
Eurocode LM1
Ponte a trave