JSB2 temporary bridge in Poronin

During the reconstruction of the bridge over the Poroniec stream in Poronin, drivers and pedestrians can use the JSB2 modular temporary bridge. To minimize the inconvenience associated with the installation of the bridge just before the Christmas and the tourist season in Podhale, for the first time in Poland complete sections of the JSB2 bridge with a length of 40.5 m were transported to the installation site as a single element.

Condividi:

Dettagli del progetto

Soluzione
Ponte a travi piane
Tipo
JSB
Lunghezza
40,5m
Larghezza
5m
Ponte a travi piane