Fjøsangerveien (E39) temporary footbridge, Bergen

Our client was looking for a temporary footbridge in the city of Bergen. All bridge spans, platforms and stairs were produced in the Netherlands and transported preassembled to Bergen. All was assembled by the Statens Vegvesen. Design was made by Janson Bridging engineering and approved by the National Road Authorities.

Condividi:

Dettagli del progetto

Soluzione
Ponte pedonale
Tipo
JPB-P
Larghezza
3 m
Capacità
5 kN/m2
Peso
165 ton
Lunghezza ponte
156 m
Ponte pedonale

Come Across